Shenhuaning Coal 4 million tons/year coal indirect liquefaction project purification device electric parallel ram switch valve procurement project tender announcement tender

Shenhuaning Coal 4 million tons/year coal indirect liquefaction project purification device electric parallel ram switch valve procurement project tender announcement tender

Announcement time: 2016/10/8



1. Bidding conditions

Entrusted by China Ryukyu Engineering Co., Ltd. to conduct a domestic open tender for the procurement of the 4 million-ton/year coal indirect liquefaction project purification equipment for electric parallel gate valve switch (Tender No.: CSIEZB160100341) of Shenhua Ningxue Coal, and invited interested qualified manufacturers to participate in the project. Sealed bidding for this project. The source of funding is self-raising.

2. Project overview and scope of tender

2.1 Project Overview: Shenhuaning Coal's 4 million-ton/year coal indirect liquefaction project (hereinafter referred to as “the project”) was solely invested by Shenhua Ningxia Coal Industry Group Co., Ltd., and its construction site is located at Ningdong Coal, Ningdong Energy Chemical Base, Ningxia Hui Autonomous Region. Chemical Base (A Area) Block B6. The project occupies a total area of ​​560.92 hectares, of which the main plant area (in-plant facilities) covers an area of ​​371.06 hectares, the torch occupies an area of ​​about 50.24 hectares, and the off-site project occupies an area of ​​approximately 139.62 hectares.

The construction scope of the project mainly includes air separation, coal preparation, coal gasification, carbon monoxide conversion, synthesis gas purification, sulfur recovery, oil synthesis, oil processing, tail gas treatment and other process equipment, as well as storage and transportation engineering and public works supporting the process equipment. , auxiliary engineering, service engineering and off-site engineering. The main technology of the project adopts pulverized coal pressure gasification technology and Sinopec Synthetic Oil Technology Co., Ltd.'s oil synthesis and processing technology.

2.2 The scope of the tender:

No. Device Name of Goods Quantity Delivery Date Delivery Location

1 Purification device electric parallel gate switch valve 5 3 sets of 18” valve within 2 months after receipt of the bid notification, and the remaining 2 valves within 3 months after receipt of the bid notification letter, coal liquefaction within Ningxia Yinwu Energy Chemical Industry Base, Lingwu City, Ningxia Project construction site (Ningdong Lingwu Ningdong Coal Chemical Industry Base B6 block)



3. Bidder qualification requirements

3.1 The bidder must be an independent legal person registered in China and have the ability to perform the contract; the registered capital should not be less than RMB 80 million;

3.2 The request of the bidder is the valve manufacturer, who does not accept the bid from the agent, and does not accept the bid of the consortium;

3.3 The bidder shall provide at least two copies of the F91 material (same or higher than F91) high pressure steam gate valve for the past three years (after 2013), with the valve material being the same or higher than F91, caliber greater than or equal to 10", and pressure rating. The number of greater than or equal to 2500 LB shall not be less than 5 (original of the contract for future reference);

3.4 The bidder must have the ISO9000 series quality management system certification and promise to provide spare parts for a long time.

4. Registration review process flow

4.3 Suppliers who have completed the registration and passed the original approval do not have to repeat the process;

5. Acquisition of bidding documents

5.1 Selling price of the bidding documents: RMB 500 yuan/set; the bidding documents will not be refunded after sale. (Only accept cash and bidder's client electronic payment)

5.2 Time for purchase of tender documents: October 8, 2016 to October 14, 2016. 8:30-11:30 am and 13:30-16:30 pm (Beijing time, except holidays).
Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.


Posted on