Indication of special contract for bidding for thermal power equipment installation project of induced draft fan for ultra-low emission renovation project of Liaoning Qinghe Power Generation 2×600MW Unit

Indication of special contract for bidding for thermal power equipment installation project of induced draft fan for ultra-low-emission reform project of Liaoning Qinghe Power Generation 2×600MW Unit
The tender documents will be available from September 30, 2016 to October 11, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon. The public bidding was conducted for the 13th batch of centralized bidding for the State Power Investment Corporation of Northeast China in 2016.
I. Basic information of the project Tenderee: State Power Investment Northeast Electric Power Co., Ltd. Project Location: Liaoning Province Project Funding Source: Self-raising Second, Bidding scope
1. List of tender bids
No.
Tender number
Section name
main indicators
Bidding Document Price (yuan)
1
C02016916GZ01WZ014-120540000001
01-Software Purchasing of Intelligent Heating Operation Platform System of National Power Investment Group Northeast Electric Power Co., Ltd.
Subsystem
unit
Quantity
Functional requirements
Thermal load development system
set
1
Including user application, contract management, charging plan, grid-connected fee collection, construction approval, construction progress, operation approval, and completion inspection.
Business Management System
set
1
Including user management, receivable management, bill management, billing management, switch bolt management, heat metering, statistical analysis, and charging channels.
Customer Service Management System
set
1
Contains automated voice, artificial agents, work order management, operations management, statistical analysis, and service channels.
Audit Management System
set
1
Include audit plans, audit entry, illegal processing, and production entry.
Geographic Information System
set
1
Including pipe network management, operation scheduling, accident handling, analysis and evaluation, pipe network editing, pipe network design.
Dispatching command system
set
1
Including on-site monitoring, commissioning command.
Energy Analysis System
set
1
Including operation evaluation, energy consumption analysis, hydraulic calculation, operation optimization.
The unified procurement of the management and control platform for the Northeastern heating system has a term of 3 years. Within 3 years, the successful bidder must maintain the unit price without changing the system function. The units within the system purchase according to the results of the procurement tender and purchase the system price.
1,000
2
C02016916GZ01WZ014-120540000002
02- Radiator Procurement of Steam Heating Water Project for Heating System of No. 1 and 9 Units of Liaoning Qinghe Power Generation Co., Ltd.
name
height
Mm
width
Mm
length
Mm
Same side import and export center distance
Mm
weight
Kg
Heat output
W/tablets
Working pressure
Mpa
Connection size
Hot water
steam
Internal cavity without radiator
683
80
63
600
6.0
174.6
0.8
0.2
G1/1⁄4”
Name Height mm Width mm Length mm Same side center distance mm Weight kg Heat dissipation W/piece Operating pressure Mpa Interface size Hot water steam chamber No sand radiator 683 80 63 600 6.0 174.6 0.8 0.2 G1/?” Name Height mm Thickness mm Length mm Same side entrance center distance mm Weight kg Copper tube mm Vertical copper tube mm Heat dissipation W/ Group working pressure Mpa Interface size Hot water copper-aluminum composite column airfoil radiator 600 15 35 25 179 1.0 G1” Name Model Number Specification Unit Remarks Inner cavity No sand cast iron radiator HYTZY1-6-8 Single column 683 85000 Pieces of soda water, each 10 pieces containing 2 leg pieces, with attachment Copper-aluminum composite column wing radiator TZY- 3525 700 sets with accessories
1,000
3
C02016916GZ01WZ014-120540000003
03-Installation and Construction of Induced Draft Fans for Ultra-Low Emissions Renovation Project of 2×600MW Units of Liaoning Qinghe Power Generation Co., Ltd.
There are a total of 4 sets of this project, each set of 2 sets of each unit, the installation site: # 1 and # 9 furnace dust collector rear, induced draft fan room. The original induced draft fan and its ancillary equipment were used for the demolition of the external transport recovery work, the installation of the new induced draft fan and its ancillary equipment, the reformation of the original induced draft fan, the installation of the new induced draft fan oil station, and the expendable materials for installation, as well as various tests and commissioning. Except for the main equipments (fans, oil stations, motors, and cables for random supply) and motor cables and switches (the tendering party is responsible for purchase), all the other components required for construction and renovation shall be the responsibility of the bidders.
1,000
4
C02016916GZ01WZ014-120540000004
04-Lianhe Qinghe Power Generation Co., Ltd. Two-phase Solid Rail Bed Line Retrofit Project for Track Scale
(1) Sleeper anchors.
(2) Dismantling old rails, breaking down the original solid bed, and transporting it out.
(3) Excavation of foundation pits, foundation moulds, cast mix (commercial concrete).
(4) Lay steel bars, spread sleepers, adjust the geometric dimensions, mix, fix, and maintain health.
(5) Distribute, connect, adjust, and fix the rails, and form a new integrated ballast line.
1,000
5
C02016916GZ01WZ014-120540000005
05- Liaoning Qinghe Power Generation Co., Ltd. Unit 1 and the first station of the heating network, part of the equipment maintenance services
Unit 1 and the first station of the heating network, part of the equipment maintenance services. Unit #1, part of the boiler, body, pipe, factory building, platform ground, 6Kv380v bus room, central control building and substation area; part of the old and new heating network of the first part of the heating network, heating station of the plant; desulphurization, dust removal and ash removal 1 unit desulfurization system, # 1/2 relay pump room, dust collector and control room; denitrification system; office building and new maintenance room.
1,000
6
C02016916GZ01WZ014-120540000006
06-Qinghe Qinghe Power Generation Co., Ltd. Units 8 and 9 and some auxiliary equipment cleaning maintenance services
The cleaning and maintenance services for Units 8 and 9 and some ancillary equipment, including but not limited to the equipments, workshops, platforms, control rooms, dust removal, desulfurization, and denitrification equipment of #8 and 9 units.
1,000
7
C02016916GZ01WZ014-120540000007
07-Slag slag treatment project of 2×600MW unit of Liaoning Qinghe Power Generation Co., Ltd.
The slag generated during the operation of two 600MW units of Party A shall be treated for crushing, slagging, and slagging; the slag generated during the operation of the unit shall be stored and unloaded; the slag produced during the production operation of the two 600MW units in 2016 shall be transported to The Caojiagou ash yard was rolled and shaped. The amount of this tender is about 133,000 cubic meters of slag.
1,000
8
C02016916GZ01WZ014-120540000008
08-Liaoning Qinghe Power Generation Co., Ltd. Factory Security Services
Party B provided the factory with gates and skills training centers, factory patrols, plant security, liquid ammonia alert, employee in-factory dress management, and assistance with petition work. The number of security provided by Party B was 38. Party A provides temporary office space to Party B.
1,000
9
C02016916GZ01WZ014-120540000009
09- Liaoning Qinghe Power Generation Co., Ltd. Plant Soot Blower Maintenance
For all of the #1, #8 and #9 units of the Qinghe Power Generation Company, all wall soot blowers, long retractable soot blowers (including graded economizer area), air precipitator soot blowers, smoke temperature probes, denitrification and soot blowing The control part of the device, the sootblower system control part, and the control part of all the valves of the soot blowing system are maintained.
1,000
10
C02016916GZ01WZ014-120540000010
10-Lvqing Qinghe Power Generation Co., Ltd. Plant Greening Maintenance Project
Greening maintenance (contracting materials) Plant maintenance, transplanting and maintenance of trees and lawns in the green area of ​​the whole plant; grass and flower maintenance of flower beds and plant-wide lawn flower beds: including: weeding, watering, fertilizing, pruning, propagation, pest control, etc.; Maintenance, repair and cleaning of flower beds and fences; planting, reseeding, and growing of flowers and trees by season; completion of greening plans and greening requirements for important activities formulated by the bidders. Non-greenbelt cleanliness Clean up ground leveling and debris weeds in non-green areas (excluding roads) throughout the plant.
1,000
11
C02016916GZ01WZ014-120540000011
11-Liaoning Qinghe Power Generation Co., Ltd. All plant special firefighting system maintenance
In addition to the fire-fighting pump room mechanical rotating equipment and outdoor underground fire-fighting facilities, fire hydrant system, all fire-fighting facilities within the entire plant maintenance, repair and maintenance. Including the host of fire automatic alarm system, peripheral alarm equipment and communication lines; equipment (including deluge valve group, wet alarm valve group, nozzle, and pipeline) of the control valve group of the automatic sprinkler system; all gas fire extinguishing equipment and pipelines . (Involved in the operation of special equipment, such as the maintenance of low-pressure carbon dioxide equipment body, imported equipment body maintenance, bidders to assist the tenderer to contact the manufacturer for repair and replacement).
1,000
12
C02016916GZ01WZ014-120540000012
12-Liaoning Qinghe Power Generation Co., Ltd. Fuel clearing and coal unloading truck project
Responsible for coal truck clearing operation, winter defrosting coal truck operation, manual unloading operation arranged by Party A when the coal train arrives in a centralized manner; clearing the coal coal bucket shed coal of the boiler, and the cleaning of the original coal bin after the boiler is shut down; responsible for cleaning Under the dumper, coal feeders, diversion stations, a total of 8 coal feeders, 4 buffer drums, 2 bucket wheelers, and all belt conveyors (22 in total) are used for the cleaning of viscous coal in other equipment; they are responsible for cleaning dumpers. Dumplings and shed coal work; clean coal cleaning area.
Estimated quantity of works: High-side cars: about 1,00060 tons, frozen coal high-side cars: about 150,800 tons.
1,000
13
C02016916GZ01WZ014-120540000013
13-Lianqing Qinghe Power Generation Co., Ltd. Fuel Clearing Line Coal Cleaning and Recycling Project
Party A currently has 2 artificial railroad clearing lines for railways (2 and 15 lanes). The “landing coal” removed from daily production operations is approximately 100,000 tons for the whole year. (From the residual coal in the coal cart after the dumper unloads the vehicle, the coal entering the clearing line is sampled and scattered, and the coal that has been unloaded by manual unloading). All cleared coal deposits must be promptly cleaned up and recycled. Coal storage yards to meet the production requirements of railways for coal-fired clean-up trucks, etc. to reduce coal loss.
1,000
14
C02016916GZ01WZ014-120540000014
14- Overhaul and Maintenance of Lighting System of the Whole Plant in Liaoning Qinghe Power Generation Co., Ltd.
1. Qinghe Power Generation Company's lighting system. Both: # 1, 7, 8, 9 machines, furnaces, electric dedusting, desulfurization plant, ontology and its subsidiary lighting system.
2. Chemical systems, clean water, hydrogen stations, ammonia stations, pump rooms, start-up furnaces, factory heating stations, and other common areas of the plant, fuel transport coal, unloading coal, coal storage, fuel mining, system, chemical system, marshalling yard lights Bridges, track scales belong to the lighting system, factory street lighting system.
3. Qinghe Power Generation Corporation owns all office power systems. Namely: administrative building, production building, property management center, fire inspection center, power generation, water ash, gas station building, GIS substation lighting and office power supply, socket, air conditioning power supply, door lighting power supply.
4. Qinghe Power Generation Company used temporary lighting installation and demolition.
1,000
15
C02016916GZ01WZ014-120540000015
15- Chaoyang Lake Yanshan Lake Power Co., Ltd. New Standardization Sample Preparation Project
Building area: 324 square meters (length: 27 meters; width: 12 meters), height of standardized sample preparation: 5.50 meters (net height 4.5 meters, truss height 1.0 meters). Single-story frame structure, wall is brick-concrete, and roof panel is a closed-insulated concrete waterproof structure. The main load-bearing components are reinforced concrete beams, the specifications are not less than 600×400, and the column spacing is not more than 3 meters. (The design should meet the normal use of 5T cranes. ), column concrete foundation buried depth of not less than 1.5 meters (under the frozen layer). As well as doors, windows, cranes, lamps and other accessories.
1,000
16
C02016916GZ01WZ014-120540000016
16-Fengxin Power Generation Co., Ltd. whole plant fire blocking renovation
The cable bridge fire resistance section under the coal transportation bridge, the coal transportation program control room to the heat network first station fire resistance section, the 01 electric furnace dust removal distribution room under the cable bridge fire blocking section and the cable hole sealing cable bridge, the No. 03 machine centralized control Line room bridge flame-resisting section, through-wall hole, disk cabinet empty flame-blocking section, No. 01 6KV wire-line room bridge fire-blocking section, empty disk cabinet, power cable brush coating bridge flame-blocking section, No. 02 furnace electrostatic precipitator Distribution room lower cabinet hole plugging and fire resistance cable tray bridge, 350,000 centralized control line room bridge fire blocking section, brush coating fire blocking section, 02 furnace electric dust distribution room cable bridge fire blocking section and cable holes Plugging of cable trays, power cable brush coatings under the No. 01 machine - 4 meter panel, through-wall holes, partition wall plugging, No. 2 machine centralized control line room bridge fire blocking section, through-holes, under-hole cabinet trays Fire retarding section, No. 02 machine 6KV wire-line room bridge fire blocking section, disk cabinet lower hole, power cable brush coating bridge fire blocking section, No. 02 machine 380V working section power distribution room shaft, No. 02 machine - 4 meters disk cabinet Power cable brush coating, wall hole, partition wall plugging, 220KV substation cable trench fire door, 380V8-9 section cable line room through wall hole C-5 cable shaft head segment block, 02 Mega Units -4 fire door, No. 01, 02 from the heat pipe unit cable tray fire board and increase fire clay.
1,000
17
C02016916GZ01WZ014-120540000017
17- CPI Northeast New Energy Development Co., Ltd. Chifeng Huangyangshan Wind Power Plant SVG Retrofit
A retrofit of the SVG unit of the 100,000-kilowatt wind power project at the Huangfengyu Wind Farm in Chifeng and Hanyangqi, and a set of SVG-type dynamic var generators with a rated capacity of ±10Mvar at the core of the IGBT. The SVG device shall be operated under the specified working conditions and load conditions and shall be installed and maintained in accordance with the operating instructions. The expected service life shall be not less than 30 years. Including the SVG equipment transformation of all equipment, materials, provision and installation, testing, commissioning (turnkey projects).
1,000
18
C02016916GZ01WZ014-120540000018
18- CPI Northeast New Energy Development Co., Ltd. DC System Insulation Monitoring Device Renovation
Transformation of DC system insulation monitoring device of China Energy Investment Northeast New Energy Development Co., Ltd., including Beipiao Beitazi Wind Farm, Chifeng Yihe Gongfengchang Coal Mineshan Wind Farm Huangyangbu Wind Farm, Dalian Tuoshan Wind Farm, Chaoyang Jianping County Hara The reform of the insulation monitoring system for the DC system of Daokou Wind Farm will provide all equipment and materials as well as installation and debugging. 1 set of North Tower, 2 sets of million shares, 2 sets of camels, 2 sets of coal kilns, 2 sets of yellow sheep, and 2 sets of Halla crossing.
1,000
19
C02016916GZ01WZ014-120540000019
19-Dalian Taishan Thermal Power Co., Ltd. plant greening maintenance
Plant green space pruning, lawn (about 75,000 square meters), some trees, flowers (including flowers and trees in office buildings), maintenance equipment, materials (such as: insecticides, soil, fertilizer, etc.) Provides; arbors and shrubs in the plant area, arbor shrubs (more than 100 plants in the whole plant area, more than 200 planting hedgerows, more than 700 trees in high-grade trees, and more than 2,000 trees in corolla trees); office buildings, comprehensive buildings, cleaning Wait.
1,000
20
C02016916GZ01WZ014-120540000020
20- Beipiao Power Generation Co., Ltd. Boiler ash removal general contracting
Beipiao Power Generation Co., Ltd. operates the operation of boiler ash handling equipment, fly ash transportation, comprehensive utilization of fly ash, and management of ash storage yards. Fly ash is transported to the ash yard and utilized to the utmost extent. Fly ash transport distance is 8 kilometers, and the annual traffic volume is about 100,000 tons.
1,000
Third, bidder qualification requirements (a) basic qualification requirements
1. The bidder shall be a registered company in China with independent legal personality.
2. With a perfect quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized quality organization or an equivalent quality management system certification.
3. In the last three years, no bad behavior such as fraudulent bid winning and serious breach of contract has occurred.
4. Not being ordered to suspend business, property was taken over, frozen and bankruptcy.
5. Has good bank credit and business reputation, operating in good condition.
6. There is no real or potential conflict of interest between the bidder and the bidder.
(II) Special qualification requirements
No.
Section name
Special qualifications
1
01-Software Purchasing of Intelligent Heating Operation Platform System of National Power Investment Group Northeast Electric Power Co., Ltd.
Registered capital of more than or equal to 10 million yuan, the successful operation of similar software systems developed in the past 3 years, provided no less than 3 heating units with a heating area of ​​not less than 10 million square meters. Has the ability to independently develop software products and related resources; has a "software enterprise certification certificate" issued by relevant departments at or above the municipal level and a "software copyright registration certificate" related to this project.
2
02- Radiator Procurement of Steam Heating Water Project for Heating System of No. 1 and 9 Units of Liaoning Qinghe Power Generation Co., Ltd.
The products provided are mature and reliable, with performance of at least three deliverables and more than two years of successful operation in the past five years.
3
03-Installation and Construction of Induced Draft Fans for Ultra-Low Emissions Renovation Project of 2×600MW Units of Liaoning Qinghe Power Generation Co., Ltd.
The registered capital is no less than RMB 10 million, and it has professional qualifications for third-grade or higher contractors for the installation of thermal power equipment. In the past five years, there have been two 600 MW unit fan installation works similar to the bid invitations for this project, which have been transformed and put into operation for two years. Above performance.
4
04-Lianhe Qinghe Power Generation Co., Ltd. Two-phase Solid Rail Bed Line Retrofit Project for Track Scale
It has the qualification for general contracting of power engineering construction or the qualification of professional contractor for mechanical and electrical equipment installation and the qualification of similar railway engineering construction and maintenance in the past three years.
5
05- Liaoning Qinghe Power Generation Co., Ltd. Unit 1 and the first station of the heating network, part of the equipment maintenance services
It has the three qualifications approved by the national construction authority. In the past five years, it has completed the cleaning construction experience and performance of the corresponding power plant units.
6
06-Qinghe Qinghe Power Generation Co., Ltd. Units 8 and 9 and some auxiliary equipment cleaning maintenance services
It has the three qualifications approved by the national construction authority. In the past five years, it has completed the cleaning construction experience and performance of the corresponding power plant units.
7
07-Slag slag treatment project of 2×600MW unit of Liaoning Qinghe Power Generation Co., Ltd.
With the qualifications of the general contracting of power engineering construction approved by the national construction authority or the qualification of the professional contractor of the mechanical and electrical equipment installation engineering, the company has completed the cleaning construction experience and performance of the corresponding power plant unit within the past five years.
8
08-Liaoning Qinghe Power Generation Co., Ltd. Factory Security Services
The registered capital is no less than 1 million yuan. It has a security service license issued by the Public Security Department of Liaoning Province. In the past three years, there have been experiences and achievements in undertaking security services in enterprises and institutions.
9
09- Liaoning Qinghe Power Generation Co., Ltd. Plant Soot Blower Maintenance
With the qualifications issued by the national construction authority for the general contracting of power engineering construction grades of grade one or above, or for the general contracting of mechanical and electrical installations, and the qualifications of the general contractors for the installation of mechanical and electrical installations; there should be two steam boilers for 600MW (including 600MW) and above grade coal-fired boilers within five years. Greyhound maintenance performance.
10
10-Lvqing Qinghe Power Generation Co., Ltd. Plant Greening Maintenance Project
With the three qualifications approved by the national construction authority, the greening maintenance experience and performance of the corresponding power plant units have been completed within the past five years.
11
11-Liaoning Qinghe Power Generation Co., Ltd. All plant special firefighting system maintenance
With registered capital of 1 million RMB or above, the fire protection system certificate issued by the national or provincial fire department or the qualification certificate for the installation and maintenance of fire protection systems; the fire protection system maintenance service for companies with two or more similar scales in the past 3 years Experience and performance.
12
12-Liaoning Qinghe Power Generation Co., Ltd. Fuel clearing and coal unloading truck project
There are three grades of general contracting for electric power engineering construction approved by the national competent department of construction, or three or more qualifications for professional contracting for mechanical and electrical equipment installation engineering. The performance of projects with the same level or similar projects as the current bidding project has been completed and is currently being fulfilled in the past five years. .
13
13-Lianqing Qinghe Power Generation Co., Ltd. Fuel Clearing Line Coal Cleaning and Recycling Project
With the qualifications of the general contracting of electric power engineering construction approved by the national construction department or the qualification of the professional contractor of mechanical and electrical equipment installation engineering. The qualifications of the project have been completed and are currently fulfilling in the past 5 years. .
14
14- Overhaul and Maintenance of Lighting System of the Whole Plant in Liaoning Qinghe Power Generation Co., Ltd.
It has the qualification of general construction contractor of the building construction and professional contractor of the electromechanical equipment installation engineering grade of grade one and above, and has two or more construction achievements of the same or similar projects.
15
15- Chaoyang Lake Yanshan Lake Power Generation Co., Ltd. New Standardization Sample Preparation Project
Steel Structure Engineering specializes in third-level and above qualifications. In the past five years, it has completed the design and construction experience and performance of similar projects.
Blocking price 64.80 million.
16
16-Fengxin Power Generation Co., Ltd. whole plant fire blocking renovation
Registered capital of more than 5 million, with the fire equipment engineering contractor qualification and effective safety production license, with the same size of the plant in the northeastern region of the power plant cable bridge fire protection and flame-retardant facilities project is not less than 3 and stable operation for more than 2 years .
17
17-China Power Investment Northeast New Energy Development Co., Ltd. Chifeng Huangyanghao Wind Farm SVG Plant Transformation
The registered capital needs to be 10 million yuan and above, and no less than 3 SVG performances of the same or similar projects have been put into operation for more than one year in the past 5 years.
18
18- CPI Northeast New Energy Development Co., Ltd. DC System Insulation Monitoring Device Renovation
The registered capital needs to be 10 million yuan and above. In the past 5 years, the performance of the insulation monitoring devices for the DC system of not less than three identical or similar projects has been transformed and normally put into operation for more than one year.
19
19-Dalian Taishan Thermal Power Co., Ltd. plant greening maintenance
With Grade III or above landscaping qualifications, in the past three years, there have been large-scale plant greening management experiences and achievements for power plants with 135MW and above units.
20
20- Beipiao Power Generation Co., Ltd. Boiler Ash General Contracting
With road transportation business licenses and safe production licenses, it has the same or similar operational performance as the project.
IV. Issues on the Offering of Bidding Documents (I) Time and Place of Sale of Bidding Documents
From September 30, 2016 to October 11, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon.
(2) The price of the bidding documents shall be paid for the bidding documents in order to purchase the bidding documents. For the details of the bidding documents, please refer to the “List of Tender Bid Sections”. The tender documents are purchased voluntarily. Once sold, the fees will not be refunded. (3) The tender documents can be sold online without accepting on-site purchases.
1. Purchase the bidding documents to perform the following operations: 1. The netizen login → 2. Search announcement → 3. Check the details of the announcement → 4. Select the participation bid, fill in the online “Buy Bidding Document Application Form” → 5. Pay the bidding document fee. See the website operating instructions \ purchase bidding documents

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

The tender documents will be available from September 30, 2016 to October 11, 2016 (excluding official holidays), from 9:00 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon. The public bidding was conducted for the 13th batch of centralized bidding for the State Power Investment Corporation of Northeast China in 2016.
I. Basic information of the project Tenderee: State Power Investment Northeast Electric Power Co., Ltd. Project Location: Liaoning Province Project Funding Source: Self-raising Second, Bidding scope
1. List of tender bids
No.
Tender number
Section name
main indicators
Bidding Document Price (yuan)
1
C02016916GZ01WZ014-120540000001
01-Software Purchasing of Intelligent Heating Operation Platform System of National Power Investment Group Northeast Electric Power Co., Ltd.
Subsystem
unit
Quantity
Functional requirements
Thermal load development system
set
1
Including user application, contract management, charging plan, grid-connected fee collection, construction approval, construction progress, operation approval, and completion inspection.
Business Management System
set
1
Including user management, receivable management, bill management, billing management, switch bolt management, heat metering, statistical analysis, and charging channels.
Customer Service Management System
set
1
Contains automated voice, artificial agents, work order management, operations management, statistical analysis, and service channels.
Audit Management System
set
1
Include audit plans, audit entry, illegal processing, and production entry.
Geographic Information System
set
1
Including pipe network management, operation scheduling, accident handling, analysis and evaluation, pipe network editing, pipe network design.
Dispatching command system
set
1
Including on-site monitoring, commissioning command.
Energy Analysis System
set
1
Including operation evaluation, energy consumption analysis, hydraulic calculation, operation optimization.
The unified procurement of the management and control platform for the Northeastern heating system has a term of 3 years. Within 3 years, the successful bidder must maintain the unit price without changing the system function. The units within the system purchase according to the results of the procurement tender and purchase the system price.
1,000
2
C02016916GZ01WZ014-120540000002
02- Radiator Procurement of Steam Heating Water Project for Heating System of No. 1 and 9 Units of Liaoning Qinghe Power Generation Co., Ltd.
name
height
Mm
width
Mm
length
Mm
Same side import and export center distance
Mm
weight
Kg
Heat output
W/tablets
Working pressure
Mpa
Connection size
Hot water
steam
Internal cavity without radiator
683
80
63
600
6.0
174.6
0.8
0.2
G1/1⁄4”
Name Height mm Width mm Length mm Same side center distance mm Weight kg Heat dissipation W/piece Operating pressure Mpa Interface size Hot water steam chamber No sand radiator 683 80 63 600 6.0 174.6 0.8 0.2 G1/?” Name Height mm Thickness mm Length mm Same side entrance center distance mm Weight kg Copper tube mm Vertical copper tube mm Heat dissipation W/ Group working pressure Mpa Interface size Hot water copper-aluminum composite column airfoil radiator 600 15 35 25 179 1.0 G1” Name Model Number Specification Unit Remarks Inner cavity No sand cast iron radiator HYTZY1-6-8 Single column 683 85000 Pieces of soda water, each 10 pieces containing 2 leg pieces, with attachment Copper-aluminum composite column wing radiator TZY- 3525 700 sets with accessories
1,000
3
C02016916GZ01WZ014-120540000003
03-Installation and Construction of Induced Draft Fans for Ultra-Low Emissions Renovation Project of 2×600MW Units of Liaoning Qinghe Power Generation Co., Ltd.
There are a total of 4 sets of this project, each set of 2 sets of each unit, the installation site: # 1 and # 9 furnace dust collector rear, induced draft fan room. The original induced draft fan and its ancillary equipment were used for the demolition of the external transport recovery work, the installation of the new induced draft fan and its ancillary equipment, the reformation of the original induced draft fan, the installation of the new induced draft fan oil station, and the expendable materials for installation, as well as various tests and commissioning. Except for the main equipments (fans, oil stations, motors, and cables for random supply) and motor cables and switches (the tendering party is responsible for purchase), all the other components required for construction and renovation shall be the responsibility of the bidders.
1,000
4
C02016916GZ01WZ014-120540000004
04-Lianhe Qinghe Power Generation Co., Ltd. Two-phase Solid Rail Bed Line Retrofit Project for Track Scale
(1) Sleeper anchors.
(2) Dismantling old rails, breaking down the original solid bed, and transporting it out.
(3) Excavation of foundation pits, foundation moulds, cast mix (commercial concrete).
(4) Lay steel bars, spread sleepers, adjust the geometric dimensions, mix, fix, and maintain health.
(5) Distribute, connect, adjust, and fix the rails, and form a new integrated ballast line.
1,000
5
C02016916GZ01WZ014-120540000005
05- Liaoning Qinghe Power Generation Co., Ltd. Unit 1 and the first station of the heating network, part of the equipment maintenance services
Unit 1 and the first station of the heating network, part of the equipment maintenance services. Part #1 of the air-conditioner unit, pipeline, factory building, platform ground, 6Kv380v busbar room, central control building and substation area; heat network first station part old and new heat network first station, plant heating station; desulphurization, dust removal and ash removal 1 unit desulfurization system, # 1/2 relay pump room, dust collector and control room; denitrification system; office building and new maintenance room.
1,000
6
C02016916GZ01WZ014-120540000006
06-Qinghe Qinghe Power Generation Co., Ltd. Units 8 and 9 and some auxiliary equipment cleaning maintenance services
The cleaning and maintenance services for Units 8 and 9 and some ancillary equipment, including but not limited to the equipments, workshops, platforms, control rooms, dust removal, desulfurization, and denitrification equipment of #8 and 9 units.
1,000
7
C02016916GZ01WZ014-120540000007
07-Slag slag treatment project of 2×600MW unit of Liaoning Qinghe Power Generation Co., Ltd.
The slag generated during the operation of two 600MW units of Party A shall be treated for crushing, slagging, and slagging; the slag generated during the operation of the unit shall be stored and unloaded; the slag produced during the production operation of the two 600MW units in 2016 shall be transported to The Caojiagou ash yard was rolled and shaped. The amount of this tender is about 133,000 cubic meters of slag.
1,000
8
C02016916GZ01WZ014-120540000008
08-Liaoning Qinghe Power Generation Co., Ltd. Factory Security Services
Party B provided the factory with gates and skills training centers, factory patrols, plant security, liquid ammonia alert, employee in-factory dress management, and assistance with petition work. The number of security provided by Party B was 38. Party A provides temporary office space to Party B.
1,000
9
C02016916GZ01WZ014-120540000009
09- Liaoning Qinghe Power Generation Co., Ltd. Plant Soot Blower Maintenance
For all of the #1, #8 and #9 units of Qinghe Power Generation Company, all wall soot blowers, long retractable soot blowers (including grading economizer area), air precipitator soot blowers, smoke temperature probes, denitrification and soot blowing The control part of the device, the sootblower system control part, and the control part of all the valves of the soot blowing system are maintained.
1,000
10
C02016916GZ01WZ014-120540000010
10-Lvqing Qinghe Power Generation Co., Ltd. Plant Greening Maintenance Project
Greening maintenance (contracting materials) Plant maintenance, transplanting and maintenance of trees and lawns in the green area of ​​the whole plant; grass and flower maintenance of flower beds and plant-wide lawn flower beds: including: weeding, watering, fertilizing, pruning, propagation, pest control, etc.; Maintenance, repair and cleaning of flower beds and fences; planting, replanting and seeding of flowers and trees according to season; greening plans and greening requirements for important activities formulated by the bidders. Non-greenbelt cleanliness Clean up ground leveling and debris weeds in non-green areas (excluding roads) throughout the plant.
1,000
11
C02016916GZ01WZ014-120540000011
11-Liaoning Qinghe Power Generation Co., Ltd. All plant special firefighting system maintenance
In addition to the fire-fighting pump room mechanical rotating equipment and outdoor underground fire-fighting facilities, fire hydrant system, all fire-fighting facilities within the entire plant maintenance, repair and maintenance. Including the host of fire automatic alarm system, peripheral alarm equipment and communication lines; equipment (including deluge valve group, wet alarm valve group, nozzle, and pipeline) of the control valve group of the automatic sprinkler system; all gas fire extinguishing equipment and pipelines . (Involved in the operation of special equipment, such as the maintenance of low-pressure carbon dioxide equipment body, imported equipment body maintenance, bidders to assist the tenderer to contact the manufacturer for repair and replacement).
1,000
12
C02016916GZ01WZ014-120540000012
12-Liaoning Qinghe Power Generation Co., Ltd. Fuel clearing and coal unloading truck project
Responsible for coal truck clearing operation, winter defrosting coal truck operation, manual unloading operation arranged by Party A when the coal train arrives in a centralized manner; clearing the coal coal bucket shed coal of the boiler, and the cleaning of the original coal bin after the boiler is shut down; responsible for cleaning Under the dumper, coal feeders, diversion stations, a total of 8 coal feeders, 4 buffer drums, 2 bucket wheelers, and all belt conveyors (22 in total) are used for the cleaning of viscous coal in other equipment; they are responsible for cleaning dumpers. Dumplings and shed coal work; clean coal cleaning area.
Estimated quantity of works: High-side cars: about 1,00060 tons, frozen coal high-side cars: about 150,800 tons.
1,000
13
C02016916GZ01WZ014-120540000013
13-Lianqing Qinghe Power Generation Co., Ltd. Fuel Clearing Line Coal Cleaning and Recycling Project
Party A currently has 2 artificial railroad clearing lines for railways (2 and 15 lanes). The “landing coal” removed from daily production operations is approximately 100,000 tons for the whole year. (From the residual coal in the coal cart after the dumper unloads the vehicle, the coal entering the clearing line is sampled and scattered, and the coal that has been unloaded by manual unloading). All cleared coal deposits must be promptly cleaned up and recycled. Coal storage yards to meet the production requirements of railways for coal-fired clean-up trucks, etc. to reduce coal loss.
1,000
14
C02016916GZ01WZ014-120540000014
14- Overhaul and Maintenance of Lighting System of the Whole Plant in Liaoning Qinghe Power Generation Co., Ltd.
1. Qinghe Power Generation Company's lighting system. Both: # 1, 7, 8, 9 machines, furnaces, electric dedusting, desulfurization plant, ontology and its subsidiary lighting system.
2. Chemical systems, clean water, hydrogen stations, ammonia stations, pump rooms, start-up furnaces, factory heating stations, and other common areas of the plant, fuel transport coal, unloading coal, coal storage, fuel mining, system, chemical system, marshalling yard lights Bridges, track scales belong to the lighting system, factory street lighting system.
3. Qinghe Power Generation Corporation owns all office power systems. Namely: administrative building, production building, property management center, fire inspection center, power generation, water ash, gas-fired office building, GIS substation building lighting and office power supply, socket, air-conditioning power supply, door lighting power supply.
4. Qinghe Power Generation Company used temporary lighting installation and demolition.
1,000
15
C02016916GZ01WZ014-120540000015
15- Chaoyang Lake Yanshan Lake Power Co., Ltd. New Standardization Sample Preparation Project
Building area: 324 square meters (length: 27 meters; width: 12 meters), height of standardized sample preparation: 5.50 meters (net height 4.5 meters, truss height 1.0 meters). Single-story frame structure, wall is brick-concrete, and roof panel is a closed-insulated concrete waterproof structure. The main load-bearing components are reinforced concrete beams, the specifications are not less than 600×400, and the column spacing is not more than 3 meters. (The design should meet the normal use of 5T cranes. ), column concrete foundation buried depth of not less than 1.5 meters (under the frozen layer). As well as doors, windows, cranes, lamps and other accessories.
1,000
16
C02016916GZ01WZ014-120540000016
16-Fengxin Power Generation Co., Ltd. whole plant fire blocking renovation
The cable bridge fire resistance section under the coal transportation bridge, the coal transportation program control room to the heat network first station fire resistance section, the 01 electric furnace dust removal distribution room under the cable bridge fire blocking section and the cable hole sealing cable bridge, the No. 03 machine centralized control Line room bridge flame-resisting section, through-wall hole, disk cabinet empty flame-blocking section, No. 01 6KV wire-line room bridge fire-blocking section, empty disk cabinet, power cable brush coating bridge flame-blocking section, No. 02 furnace electrostatic precipitator Distribution room lower cabinet hole plugging and fire resistance cable tray bridge, 350,000 centralized control line room bridge fire blocking section, brush coating fire blocking section, 02 furnace electric dust distribution cabinet cable bridge fire blocking section and cable holes Plugging of cable trays, power cable brush coatings under the No. 01 machine - 4 meter panel, through-wall holes, partition wall plugging, No. 2 machine centralized control line room bridge fire blocking section, through-holes, under-hole cabinet trays Fire retarding section, No. 02 machine 6KV wire-line room bridge fire blocking section, disk cabinet lower hole, power cable brush coating bridge fire blocking section, No. 02 machine 380V working section power distribution room shaft, No. 02 machine - 4 meters disk cabinet Power cable brush coating, wall hole, partition wall plugging, 220KV substation cable trench fire door, 380V8-9 section cable line room through wall hole C-5 cable shaft head segment block, 02 Mega Units -4 fire door, No. 01, 02 from the heat pipe unit cable tray fire board and increase fire clay.
1,000
17
C02016916GZ01WZ014-120540000017
17- CPI Northeast New Energy Development Co., Ltd. Chifeng Huangyangshan Wind Power Plant SVG Retrofit
A retrofit of the SVG unit of the 100,000-kilowatt wind power project at the Huangfengyu Wind Farm in Chifeng and Hanyangqi, and a set of SVG-type dynamic var generators with a rated capacity of ±10Mvar at the core of the IGBT. The SVG device shall be operated under the specified working conditions and load conditions and shall be installed and maintained in accordance with the operating instructions. The expected service life shall be not less than 30 years. Including the SVG equipment transformation of all equipment, materials, provision and installation, testing, commissioning (turnkey projects).
1,000
18
C02016916GZ01WZ014-120540000018
18- CPI Northeast New Energy Development Co., Ltd. DC System Insulation Monitoring Device Renovation
Transformation of DC system insulation monitoring device of China Energy Investment Northeast New Energy Development Co., Ltd., including Beipiao Beitazi Wind Farm, Chifeng Yihe Gongfengchang Coal Mineshan Wind Farm Huangyangbu Wind Farm, Dalian Tuoshan Wind Farm, Chaoyang Jianping County Hara The reform of the insulation monitoring system for the DC system of Daokou Wind Farm will provide all equipment and materials as well as installation and debugging. 1 set of North Tower, 2 sets of million shares, 2 sets of camels, 2 sets of coal kilns, 2 sets of yellow sheep, and 2 sets of Halla crossing.
1,000
19
C02016916GZ01WZ014-120540000019
19-Dalian Taishan Thermal Power Co., Ltd. plant greening maintenance
Plant green space pruning, lawn (about 75,000 square meters), some trees, flowers (including flowers and trees in office buildings), maintenance equipment, materials (such as: insecticides, soil, fertilizer, etc.) Provides; arbors and shrubs in the plant area, arbor shrubs (more than 100 plants in the whole plant area, more than 200 planting hedgerows, more than 700 trees in high-grade trees, and more than 2,000 trees in corolla trees); office buildings, comprehensive buildings, cleaning Wait.
1,000
20
C02016916GZ01WZ014-120540000020
20- Beipiao Power Generation Co., Ltd. Boiler Ash General Contracting
Beipiao Power Generation Co., Ltd. operates the operation of boiler ash handling equipment, fly ash transportation, comprehensive utilization of fly ash, and management of ash storage yards. Fly ash is transported to the ash yard and utilized to the maximum extent. Fly ash transport distance is 8 kilometers, and the annual traffic volume is about 100,000 tons.
1,000
Third, bidder qualification requirements (a) basic qualification requirements
1. The bidder shall be a registered company in China with independent legal personality.
2. With a perfect quality management system, it must hold an ISO9001 quality management system certification issued by a nationally recognized quality organization or an equivalent quality management system certification.
3. In the last three years, no bad behavior such as fraudulent bid winning and serious breach of contract has occurred.
4. Not being ordered to suspend business, property was taken over, frozen and bankruptcy.
5. Has good bank credit and business reputation, operating in good condition.
6. There is no real or potential conflict of interest between the bidder and the bidder.
(II) Special qualification requirements
No.
Section name
Special qualifications
1
01-Software Purchasing of Intelligent Heating Operation Platform System of National Power Investment Group Northeast Electric Power Co., Ltd.
Registered capital of more than or equal to 10 million yuan, the successful operation of similar software systems developed in the past 3 years, provided no less than 3 heating units with a heating area of ​​not less than 10 million square meters. Has the ability to independently develop software products and related resources; has a "software enterprise certification certificate" issued by relevant departments at or above the municipal level and a "software copyright registration certificate" related to this project.
2
02- Radiator Procurement of Steam Heating Water Project for Heating System of No. 1 and 9 Units of Liaoning Qinghe Power Generation Co., Ltd.
提供的产品成熟可靠,近五年内至少三个供货业绩且两年以上成功运行的业绩。
3
03-辽宁清河发电有限责任公司2×600MW机组超低排放改造工程引风机安装施工
注册资本不少于1000万元,具有火电设备安装工程专业承包三级及以上资质,近五年内具有与本项目招标标的相类似的600MW机组风机安装施工2台且已改造施工后投运2年以上业绩。
4
04-辽宁清河发电有限责任公司轨道衡两端固体道床线路改造工程
具有电力工程施工总承包叁级或机电设备安装工程专业承包叁级及以上资质,近三年同类铁路工程施工维护业绩。
5
05-辽宁清河发电有限责任公司1号机组及热网首站、部分属设备保洁维护服务
具有国家建设主管部门核定的三级资质,在过去五年内有已完相应电厂机组的保洁施工经验和业绩.
6
06-辽宁清河发电有限责任公司8、9号机组及部分附属设备保洁维护服务
具有国家建设主管部门核定的三级资质,在过去五年内有已完相应电厂机组的保洁施工经验和业绩.
7
07-辽宁清河发电有限责任公司2×600MW机组炉渣处理工程
具有国家建设主管部门核定的电力工程施工总承包三级或机电设备安装工程专业承包三级及以上资质,在过去五年内有已完相应电厂机组的保洁施工经验和业绩.
8
08-辽宁清河发电有限责任公司全厂保安服务
注册资本不低于100万元,具有辽宁省公安厅颁发的保安服务许可证,在过去三年内有在企事业单位承接保安服务的经验和业绩。
9
09-辽宁清河发电有限责任公司全厂吹灰器维护
具有国家建设主管部门核发的电力工程施工总承包叁级及以上,或机电安装工程施工总承包贰级及以上资质;五年内应具有2家600MW(含600MW)及以上等级燃煤机组锅炉蒸汽吹灰器维护业绩。
10
10-辽宁清河发电有限责任公司全厂绿化维护工程
具有国家建设主管部门核定的三级资质,在过去五年内有已完相应电厂机组的绿化维护经验和业绩。
11
11-辽宁清河发电有限责任公司全厂特殊消防系统维护保养
注册资金在100万及以上,;具有国家或省消防部门颁发的消防系统维护保养资质证书或消防系统安装、维修资质证书;近3年内具有两个及以上类似规模生产企业的消防系统维护保养服务经验和业绩。
12
12-辽宁清河发电有限责任公司燃料清车底及卸煤车工程
有国家建设主管部门核定的电力工程施工总承包三级或机电设备安装工程专业承包三级及以上资质,近5年已有完成和现在正在履行的与本招标工程同等级规模或相近项目的业绩。
13
13-辽宁清河发电有限责任公司燃料清车线燃煤清理回收工程
具有国家建设主管部门核定的电力工程施工总承包三级或机电设备安装工程专业承包三级及以上资质,近5年有已完成和现在正在履行的与本招标工程同等级规模或相近项目的业绩。
14
14-辽宁清河发电有限责任公司全厂照明系统检修维护
具有房屋建筑工程施工总承包叁级和机电设备安装工程专业承包叁级及以上资质,有两个及以上相同或相近工程的施工业绩。
15
15-朝阳燕山湖发电有限公司厂区新建标准化制样间工程
钢结构工程专业承包三级及以上资质,过去五年内有已完成类似工程的设计及施工经验和业绩。
拦标价64.80万元。
16
16-阜新发电有限责任公司全厂防火封堵改造
注册资金500万以上,具有消防设施工程专业承包壹级资质及有效的安全生产许可证,具有东北严寒地区同等规模电厂电缆桥架防火阻燃设施完善工程项目不低于3个且稳定运行2年以上。
17
17-中电投东北新能源发展有限公司赤峰黄羊洼风电场SVG装置改造
注册资金需在1000万元及以上,近5年来不少于3个相同或类似工程SVG业绩并正常投运1年以上。
18
18-中电投东北新能源发展有限公司直流系统绝缘监测装置改造
注册资金需在1000万元及以上,近5年来不少于3个相同或类似工程直流系统绝缘监测装置改造业绩并正常投运1年以上。
19
19-大连泰山热电有限公司厂区绿化维护
具有三级及以上园林绿化资质,过去三年内有已完电厂135MW及以上机组的大型厂区绿化管理经验和业绩。
20
20-北票发电有限责任公司锅炉除灰总承包
具有道路运输经营许可、安全生产许可证,有与本工程的规模相同/相近的良好的运行业绩。
IV. Issues on the Offering of Bidding Documents (I) Time and Place of Sale of Bidding Documents
2016年9月30日至2016年10月11日(法定节假日除外),上午9:00~11:30,下午13:30~17:00。
(2) The price of the bidding documents shall be paid for the bidding documents in order to purchase the bidding documents. For the details of the bidding documents, please refer to the “List of Tender Bid Sections”.招标文件自愿购买,一经售出,费用概不退还(三)招标文件发售方式在线发售,不接受来人现场购买。
1. Purchase the bidding documents to perform the following operations: 1. The netizen login → 2. Search announcement → 3. Check the details of the announcement → 4. Select the participation bid, fill in the online “Buy Bidding Document Application Form” → 5. Pay the bidding document fee.详见网站操作说明\购买招标文件

Posted on